Question: 1
Refer to the exhibit. A network engineer is implementing a configuration checkpoint on a Cisco Nexus 9000 Series Switch. The configuration must skip any existing vPC configuration errors and must complete if there are any configuration errors. The engineer finished the vPC domain configuration part. Which command completes the checkpoint implementation?
Question: 2
Refer to the exhibit. Which action completes the vPC domain implementation?
Question: 3
Refer to the exhibit. Which information must be added to the script to complete the POAP operation on the Cisco Nexus 9000 Series Switch?
Question: 4
Refer to the exhibit During a vPC peer switch reload, there is packet loss between the server and the router Which action must be taken to prevent this behavior during future reloads?
Question: 5
Refer to the exhibit. A network engineer is configuring the Smart Call Home feature on a Cisco Nexus Series Switch. An email must be generated that contains the last 100 lines of the log every time a new piece of hardware is inserted into the chassis. Which command must be added to the configuration to receive the email?