Question: 1
According to the ISTQB syllabus, domain testing quality attributes are;
I . Accuracy, Suitability, Interoperability
II . Reliability, Maintainability, Portability
III . Performance, load, Adaptability
Question: 2
Select the correct statement(s). According to the ISTQB Syllabus;
I . Unauthorized access & copying, buffer overflow, logic bombs are part of Technical Security Testing.
II . Fallback, backup and restore activities are part of recoverability testing.
III . Verifying whether a system can handle peak loads at or above maximum capacity is called stress testing.
IV . Verifying whether a system can "meet future efficiency requirements" is called scalability testing
Question: 3
A Software Test Analyst at ABC company. received a new software release and the installation guide from Development. He followed the installation guide and successfully installed the software. Then he followed the fallback instructions and performed a successful fallback. After verifying that the software has completely fallen back as desired, he re-installed the software. What type of testing activity did he do?
Question: 4
Which of the following statements are correct?
I . IEEE 1028 is an international standard on reviews.
II . Early reviews are very cost effective in finding defects.
III . Review is considered a static testing
IV . Most documents can be reviewed (source code, requirements document, test plan document)
Question: 5
You are a test analyst for XYZ Company. CEO of XYZ sent a meeting entry to you and your manager for a past project evidence and test deliverables review. A person from an external company would like to interview you regarding the previous project. This activity has a very high visibility from upper management. What type of review is described above?