Question: 1
The capacity required depends on the particular mix of products being built and is difficult to predict is a characteristic of:
Question: 2
A process costs $200 to set up. The run time is 5 minutes per piece and the run cost is $30 per hour. Determine the fixed cost?
Question: 3
The CPI system is based on the scientific methods. This general method is used to solve many kinds of problems. Which of the following is NOT the out of six steps continuous improvement process?
Question: 4
Which of the following is NOT the dimension to quality measurements?
Question: 5
A process costs $200 to set up. The run time is 5 minutes per piece and the run cost is $30 per hour. Determine the fixed cost?